Greenway diversion emergency safety scheme

The Greenway is one of East London's primary walking and cycling corridors, providing an important traffic-free route connecting communities across Newham and linking residents to employment, education, public transport, leisure facilities and regional cycling networks.

The Greenway is a privately owned asset, owned by Thames Water containing a permissive path and is not a part of the adopted public highway network. As a result, Thames Water is entitled to close all or part of the route to facilitate its operational, maintenance and safety requirements.

The Greenway has been subject to extensive closures since September 2024, with a full closure between Upper Road and Channelsea Path currently expected to remain in place for a minimum of two more years whilst Thames Water undertakes a major repair programme on the Northern Outfall Sewer.

Whilst the Council recognises the importance and necessity of the works, the prolonged closure has generated significant concern amongst residents, businesses, elected members and walking and cycling groups due to the loss of a key segregated active travel corridor. These works have diverted pedestrians and cyclists onto other routes connecting Upper Road, Plaistow, West Ham and Stratford. These routes currently experience higher traffic volumes and do not provide the same level of safety or user experience as the Greenway.

The Mayor of Newham has been in regular communication with Thames Water in order to accelerate the programme, investigate phased reopening options and get voluntary financial support towards mitigation measures on alternative routes.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.

During the closure of this section of the Greenway, the Council has drawn up plans to improve the diversion routes to make them safer for pedestrians and cyclists. These improvements are intended to provide better safety both in the short-term, and potential longer-term benefits beyond the timescales of the current Greenway closure.

Diversion route map

This diversion route map shows the extent of the current closure and two diversion routes which are proposed to be improved in due course. These improvements will consist of: •	Segregated two-way cycle tracks •	Bus stops with cycle bypasses •	Removal or relocation of traffic islands to create more carriageway width for cycle tracks •	Changes to junction design  •	New pedestrian and cyclist road crossings

The map above shows the extent of the current closure and two diversion routes which are proposed to be improved in due course.

These improvements will consist of:

  • Segregated two-way cycle tracks
  • Bus stops with cycle bypasses
  • Removal or relocation of traffic islands to create more carriageway width for cycle tracks
  • Changes to junction design
  • New pedestrian and cyclist road crossings


Diversion route proposed design

Click the PDF below for the design of the full route

The image above shows just one page of the design PDF. For the full design click the PDF below.

Frequently Asked Questions (FAQs)

Why is the Council proposing these works?

Thames Water has closed the Greenway between Upper Road and Channelsea Path. These works have diverted pedestrians and cyclists onto other routes connecting Upper Road, Plaistow, West Ham and Stratford. These routes currently experience higher traffic volumes and do not provide the same level of safety or user experience as the Greenway. The works proposed will improve the diversion routes to make them safer for pedestians and cyclists.


Is the project funded and definitely going ahead?

Yes, the Greenway Diversion Emergency Safety Scheme was approved and the 5-day call-in period has elapsed.

Further information about the decision is available here.


What are the construction timescales?

Phase 1 (Plaistow Road, Mitre Lane, Bridge Road) will be an interim diversion route, with works proposed to start in early 2027 and finish in Autumn 2027.

Phase 2 (Plaistow Road and West Ham Lane) will be the final diversion route, with works proposed to start in summer 2027 and finish in early 2028.

All dates referred to above are dependent on the appropriate statutory consultation and approvals.


How long will this section of the Greenway be closed?

Closures to the Greenway are decided by Thames Water. As of the date of this letter, the closure is estimated to last for a futher two years but could be substantially longer. For closure updates, please visit Thames Water webpages at the link:

www.thameswater.co.uk/about-us/projects/improvements-in-your-area/manor-road-bridge-improvements


How will parking and loading be affected?

Maintaining parking and loading for residents and businesses is a priority for the council. Where possible, parking and loading will be kept along the diversion route. Where changes to parking and loading are required, the Council will engage with residents and businesses to identify alternative provisions wherever possible. For more details as they become available, please check the project web page.

Contact us and feedback

If you would like to provide feedback on Newham’s Greenway Emergency Diversion Safety Scheme, please e-mail traffic@newham.gov.uk and make the subject line Greenway diversion and we will review your e-mail. Please note that any questions or comments about the closure itself should be directed to Thames Water.