The projects aim to uplift existing assets along and around the high streets to increase footfall by improving people’s perceptions of the town centre’s public realm. The proposed creative public realm improvements aim to bring a sense of identity to Forest Gate by making the area welcoming to the town centre, safer and cleaner. The project aims to address recommendations in Newham High Streets Strategy: ‘Welcome to Forest Gate’, and ‘Forest Gate Youth Zone Public Realm’. The concept design proposal for the project will be developed through a community co-design process and re-landscaping of the public realm is likely to include:

  • Providing opportunities for the Youth Zone and wider community to use the space (e.g. layout of paving, trees and street furniture to enable possibilities for street dance, art & craft fairs, mini-fests etc.)
  • Creating a brighter more welcoming area (e.g. use of lighting in the square and under the bridge etc)
  • Supporting a clean and green environment
  • Re-configuring street furniture arrangements (e.g. create a secure, durable and attractive seating area, consider repaint/relocate/replace the bike racks and railings outside the Youth Zone etc.)
  • Improving pavement surface condition and consider extent (e.g. ensuring even and level surfaces, consider de-paving, consider area of pedestrian priority under bridge when vehicles enter youth zone etc.)

The final design proposal for the project will be developed through a community co-design process and your opinion on the types of improvements is important. Do you have any further ideas or want to comment on the proposed improvement types above, please see the timeline at the bottom of the page for details on how to share your thoughts at each project stage.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
5 participants

Phases

Phases overview
Strategic Recommendation
Funding Bid
Selection of the Design Team
Community Engagement: Ideas for the space outside the Youth Zone
Design Development and Options Consultation 1
Design Development and Options Consultation 2
Preferred Proposal Consultation
Design finalisation
Technical Design
Works orders and Mobilisation
Installation

Preferred Proposal Consultation

November 25, 2023 - December 17, 2023

View the preferred proposal for the project and have your say.

Option 1: Welcoming

Option 1: Welcoming

Option 2 Brightening 

Option 2 Brightening

Please download the document below to find out about the new design ideas and e-mail it with your comments to NewhamHighStreets@newham.gov.uk . Please note when you open the PDF document, click on 'Fill & Sign' function button to be able to insert your comments or tick your preferred option on the document.

Alternatively open the attached document below to view the design options and e-mail your comments directly without the document to NewhamHighStreets@newham.gov.uk

Your comments and ideas are important, we look forward to hearing from you by Monday 18th December.

Thank you!